#1: Project run about Author: MrBSI, Location: What's it to you? ? ?Posted: Wed Oct 29, 2014 12:36 pm ---- Well after doing 32 hours overtime last month i've now got a new project on the go, no picture's yet till weekend when it's light.
Over the weekend I picked up a 53 plate 5 door SE spec 1.4 petrol 16 valve with manual box for the grand sum of £500.
It's done 115k mile's, MOT tested till end of June 2015, came with lot's of old paper work & it's HPI clear.
I've stuck 6 month's tax on it & then the insurance was £30 to add it on my current policy for a month
Drive's ok apart from a flat spot at low rev's ( possibly gummed up VVT ) & clutch is heavy.
Done about 80 miles on the way home & water + oil temp's sat at a rock steady 90 deg C.
Load's of silly little job's to do, mainly my time & hunt in my part's collection for bit's.
So far I've done:
Replaced a broken interior roof grab handle.
Replaced MFD bulbs.
Freed of both door lock barrels.
Adjusted tailgate so it shut's correctly.
Replaced broken dipstick.
Replaced missing SP vent knob's on 2 vent's.
Currently waiting on the weekend to come so I can work in the light
The car was cheap BUT I also know it does need some time & money spending on it to bring it up to standard again.
Ill update thread with picture's over the weekend.
#2: Re: Project run about Author: MrWhite, Posted: Wed Oct 29, 2014 1:11 pm ---- Cant wait to see it MrBsi. Sent you a pm a while ago not sure you have the inbox space BTW.
#3: Re: Project run about Author: MrBSI, Location: What's it to you? ? ?Posted: Wed Oct 29, 2014 1:21 pm ---- Your PM might have been in a load I nuked last week, I just emptied the complete inbox as it had been filled up with load's of odd messages from newbies sorry about missing it - send it again if you still have it & ill respond.
#4: Re: Project run about Author: Edward, Location: In the garagePosted: Wed Oct 29, 2014 2:06 pm ---- Lexus lights and 17" wheels needed. Then a GTi engine transplant! 90mm lowering too.
#5: Re: Project run about Author: LeeThr, Location: North West WalesPosted: Wed Oct 29, 2014 3:28 pm ----
Edward wrote:
Lexus lights and 17" wheels needed. Then a GTi engine transplant! 90mm lowering too.
Don't forget the "Phat! bodykit" and the "well sik sound system".
#6: Re: Project run about Author: MrBSI, Location: What's it to you? ? ?Posted: Wed Oct 29, 2014 5:37 pm ---- This one is staying factory standard, I'm just gonna fix all the issues & give it a major service.
#7: Re: Project run about Author: Barking, Location: sarcasm-in-shedloadsPosted: Wed Oct 29, 2014 5:45 pm ---- You sure love those apostrophes
Most of them are not required, as plurals don't need apostrophes Last edited by Barking on Wed Oct 29, 2014 5:48 pm; edited 1 time in total
#8: Re: Project run about Author: MrBSI, Location: What's it to you? ? ?Posted: Wed Oct 29, 2014 5:47 pm ----
Barking wrote:
You sure love those apostrophes
None of them are required as plurals don't need apostrophes
Cheers for the English lesson I didn't ask for, I just wont bother in future
#9: Re: Project run about Author: Barking, Location: sarcasm-in-shedloadsPosted: Wed Oct 29, 2014 5:49 pm ----
MrBSI wrote:
Barking wrote:
You sure love those apostrophes
None of them are required as plurals don't need apostrophes
Cheers for the English lesson I didn't ask for, I just wont bother in future
It's okay Lee. You noticed, so my work is done
#10: Re: Project run about Author: Timon2210, Location: PalestinePosted: Fri Oct 31, 2014 9:43 am ---- Well that is a nice project,this car is lucky that it ended to your skillful hands :),it will have a nice new life,so it got the KFU engine on board ;),can't wait to see pics of it.
I have sent you a mesg. too,guess it went with loads you deleted,i will send it to you again
#11: Re: Project run about Author: MrBSI, Location: What's it to you? ? ?Posted: Sun Nov 02, 2014 11:19 am ---- Been raining most of the weekend so no pictures yet
Anyway more jobs done:
Binned the crappy Peugeot locking wheel bolts & fitted some McGards.
Replaced blown cigarette lighter & ashtray bulbs.
Had the Com 2000 unit apart & sorted the wiper stalk out so rear wiper & trip computer now work correctly, just swopped the end unit over - was shocked to find it's the original October 2003 unit
Binned the crappy NGK spark plugs & fitted some new Bosch one's, already runs a hell of a lot better
Replaced a broken breather pipe.
Repaired the non working ultrasonic alarm button.
#12: Re: Project run about Author: Timon2210, Location: PalestinePosted: Sun Nov 02, 2014 11:34 am ---- Good that you don't waste anytime to fix it
#13: Re: Project run about Author: MrBSI, Location: What's it to you? ? ?Posted: Sun Nov 02, 2014 11:50 am ---- Forgot to mention I had to buy a special small spark plug socket as the ET3 engine uses smaller then normal spark plugs
If you want to change plugs on a ET3 lump then this is the spark plug socket you will need
#14: Re: Project run about Author: Edward, Location: In the garagePosted: Sun Nov 02, 2014 11:54 am ---- I had to buy one of those sockets to get the plugs out of our 207 CC.
#15: Re: Project run about Author: MrBSI, Location: What's it to you? ? ?Posted: Sun Nov 02, 2014 11:56 am ---- Worked a treat, i've never seen plugs with that small a hex on a automotive engine before.
We are not responsible for comments posted by our users, as they are the property of the poster
Interactive software released under GNU GPL,
Code Credits,
Privacy Policy