Joined: Feb 08, 2010 Posts: 10151
Trade Rating: +12
|
|
Is this the correct orientation?
(red arrow = welding point)
The main tube weld onto the strengthen plate and then weld the strengthen plate onto the footwell?
The floating nuts is welded onto the main tube.
I have look into the MSA blue book it doesn't mention anything about the seat subframe. it just said 4 point mounting, 8mm bolts, 2 front and 2 rear...lol
| | |
|
|